Survey measurements checklist
Below is a checklist of things that you should do prior to making measurements. The checklist will not take long to address, and can save you a lot of time and frustration later.
- Instrument Time: Set correctly?
- Chamber Gaskets: Inspected and OK?
- Batteries: Charged and ready?
- Soil Temperature Probe: If using, connected and responding?
- Soil Moisture Probe: If using, connected and responding?
- Soil Collars: In place for at least several hours, but ideally 24 hours?
- Soil Collar Area: Entered in the software?
- Soil Collar Offset: Prepared to measure and enter in the software?
- Observations Configured: Observation length of 90 to 120 seconds. Dead band of 10 to 60 seconds. Purge times set?